June 20, 2015 - East of Hyannis - KneeKnacker

Building a boardwalk, Part 1

After finding the optimal path for the boardwalk, the supporting boxes are placed so the stringers (the long timbers) can be positioned. After a moment to assess the path, the crew will either reposition the boardwalk or start hammering. Sometimes both.

DSC06814DxO